The engineering construction of Bohai Oilfield has set a new record

In 2022, Bohai Oilfield has built a total of 59 new jackets, modules and living building units, completed the offshore installation of 35 jackets and modules, including the Bozhong-Kenli shore power project. The engineering construction workload has set a record, further consolidate the status of Bohai Oilfield as the country’s largest crude oil production base, and promote Bohai Oilfield to become the second largest oil and gas field in China.

Bohai Oilfield

Bohai Oilfield

It is reported that in 2022, the total steel processing volume of new projects in Bohai Oilfield has been about 200000 structural tons; 418 kilometers of submarine pipelines and cables were laid throughout the year. In 2023, Bohai Oilfield plans to build 31 new jackets, 38 modules and 9 living buildings, and the engineering construction workload will remain high.

Pipeline product

Pipeline product

As a well-known domestic and international pipeline equipment supplier, Haihao Group has participated in the supply of pipeline facilities for some projects in Bohai Oilfield. The main products include oil and gas pipelines, flanges, elbows and other pipeline supporting products. In 2023, Haihao will continue to carry out more in-depth cooperation with the project and provide more high-quality products and services for the development of Bohai Oilfield.

Prev:
Next:


X

skype
email